Elevator & Escalator Installation

Vertical transport, installed to code, floor by floor.

DM Works plans, installs, and commissions passenger elevators, freight elevators, home lifts, and escalators — from shaft survey through final certification.

MACHINE ROOM GUIDE RAIL SHAFT PIT CAB — FLR 3
FIG. 01 — SHAFT CROSS-SECTIONSCALE N.T.S.
What we install

Four systems, one crew.

Each installation is engineered around the building's traffic, shaft dimensions, and code jurisdiction before a single rail goes in.

Passenger elevators

Traction and machine-room-less (MRL) systems for offices, residential towers, and mixed-use buildings.

2–8 STOPS · 630–1600 KG

Freight & goods lifts

Heavy-duty cabs and reinforced rail systems built for warehouses, loading docks, and industrial sites.

UP TO 5000 KG · STEEL CAB

Home & low-rise lifts

Compact, low-power platform and cab lifts for private residences and small multi-storey buildings.

2–3 STOPS · COMPACT SHAFT

Escalators & walkways

Public-traffic escalators and moving walks for malls, transit stations, and commercial lobbies.

30°/35° INCLINE · HEAVY DUTY
How installation works

Six floors, one build.

Every project climbs through the same six stages, from the first shaft measurement to the handover walkthrough.

01

Site survey & shaft verification

We measure shaft plumb, headroom, and pit depth against the selected system, and confirm structural loads with the building engineer.

1–3 days on site
02

Shaft & pit preparation

Contractors finish the pit, ventilation, and power supply to spec before any equipment arrives, so the install crew never waits on trades.

Coordinated with GC
03

Guide rails & machine installation

Guide rails are plumbed and bolted floor by floor, then the hoist machine, controller, and counterweight are set and aligned.

Structural anchoring
04

Cab, doors & controls

The cab is assembled in place, landing and cab doors are hung and interlocked, and the control system is wired and configured.

Interlock testing begins
05

Testing & certification

Load tests, safety-gear trips, and door-force checks are run and logged, then verified by an independent inspector against local code.

Third-party inspection
06

Handover & maintenance plan

Building staff receive operating documentation and emergency procedures, and the unit is enrolled in a scheduled maintenance plan.

Warranty starts

Ready to plan your shaft?